NetSuite and Choosing an ERP

What to ask an implementation partner before you sign an ERP project

Ten questions on deliverables, team, data, testing and scope changes to review an ERP implementation proposal before you sign it.

· 5 min read

An ERP project proposal usually arrives well presented and with a clear price. What almost never arrives clearly is what happens between signing and go-live: who does what, what gets delivered, how it is accepted and what happens when something changes.

These ten questions are designed for reading any proposal, from anyone. They don't assume anything is wrong. They exist so the answers are in writing before you start, when clarifying them is still cheap.

Ask them before signing, in writing, and with the person on the other side who will sign the proposal, not only with whoever presents it. A verbal answer in a meeting gets forgotten; an answer in an appendix can be reviewed three months later.

A proposal can only be as precise as the information it received. Before the questions, bring four things to the meeting: the list of processes the system must cover, the number of users and the transaction volume, the integrations with existing systems, and the date you truly need to be operating, along with the reason for that date. With that, the answers stop being generic.

What gets delivered

  • What are the deliverables for each phase, and what does a finished one look like? “Procurement module configuration” can mean a lot or a little. Ask for concrete examples: an approved design document, a configured environment, a reconciled data load.
  • How is a deliverable accepted? Define who reviews it on your side, within how many days and against what criteria. A deliverable without acceptance criteria gets argued over at the end.

This first group prevents the most common disagreement in a project: believing something was delivered that the other party doesn't consider finished.

Who does the work

  • Who are the people who will work on my project, with what experience and what weekly commitment? A team with names and percentages can be monitored. A “team of consultants” cannot.
  • How much time do you need from my team? Every project demands hours on your side, especially from finance and operations. It is better to know how many from the start than to find out in week three.

What happens with the data

  • Who cleans and who loads the data, and how many test loads are planned? Oracle offers file-based import templates for loading data into its cloud applications, so ask whether they will be used and how many rehearsals the price includes.
  • How do we verify that the balances in the new system match those in the old one? The answer should name a report and a person.

How it is tested and how it goes live

  • How many test environments does the proposal include? Oracle documents that the test environment is used to validate before moving to production. Ask how many test cycles are run and who designs them.
  • What conditions must the project meet to go live, and what happens if they aren't met? A date without exit criteria is just an intention.

What happens when something changes

  • How is a scope change requested, evaluated and billed? There will always be changes. What matters is that there is a procedure and a way to calculate their cost before approving them.
  • What do I keep when it's over? Ask about administrator access, configuration documentation and rights to whatever is built. If you ever change providers, this is the difference between continuing and starting over.

How to read the answers

More than the content of each answer, its form matters. A good answer is specific, in writing and verifiable. An answer that depends on “we'll work it out during the project” is not a bad sign in itself, but it deserves a second question: when is it defined and who decides? If after that second question the date and the owner still have no name, record it as an open item in the appendix, not as an agreement.

It also helps to tie payments to accepted deliverables, not just to dates. That way the payment schedule and the project's real progress move together.

Where problems tend to appear

These points recur in projects from any provider and for any product; they are not specific to any one. The ten questions above cover them, but it is useful to name them:

  • An ambiguous scope, which each party interprets in its own favor.
  • Data that arrives late or dirty, forcing tests to be repeated.
  • Little client involvement in decisions, which end up being made by default.
  • Changes without a procedure, which pile up and push the date back.
  • Testing compressed into the end, when there is no margin left to correct.

When a proposal addresses these five, the project starts with less risk. When it doesn't mention them, it doesn't mean they will occur, but it is worth asking how they are prevented.

Three questions for your company

Before asking them, it is worth answering three on your company's side. Who will decide when two departments disagree? How many hours a week will that person have available? Which process is your company willing to change instead of customizing the system? Oracle recommends minimizing customizations in the cloud because they are costly to build and maintain, and that decision is made at the start, not at the end.

These questions apply to our proposals too. If you are comparing alternatives and want to review the scope of a proposal together, tell us which system you are evaluating and what stage you are in. At www.ceteris.mx/servicios-profesionales/ you can see how we work, or you can schedule a conversation with our team.

Facing something similar?

Tell us which system you run and what it can't do for you today. The first conversation is about understanding your situation.

Request an assessment
Cover of the CETERiS guide From Excel to ERP (in Spanish)

Free guide · 24 pages · In Spanish

From Excel to ERP: how to tell if it's time

What we'd tell you in a first assessment meeting, in writing: how to know whether you need an ERP, what it costs in estimated ranges and how to migrate without disrupting operations. Currently available in Spanish; English edition coming soon.

  • The 7 signs you've outgrown spreadsheets
  • What an ERP costs and what drives the price
  • The 5 most expensive mistakes
  • A checklist to decide whether it's time
Download the guide (Spanish)Free. Delivered to your inbox.